PDA

View Full Version : BP Takes New Tack to Capture Escaping Oil in Gulf



MNeagle
10th May 2010, 06:30 PM
By ANGEL GONZALEZ
HOUSTON—After a rapidly freezing mix of natural gas and water derailed attempts to place a big underwater dome on top of a deepwater well leaking oil into Gulf of Mexico, BP PLC hopes a smaller dome will do the trick, Chief Executive Tony Hayward said Monday.

The big dome failed because "there's a lot more gas involved in the leak than we had hitherto believed," Mr. Hayward said. The gas combined with water to form hydrates that clogged a 12-inch opening at the top of the structure, he added.

The new steel dome, five feet in diameter and five feet tall and shaped like a "top hat," will be ready to deploy within 72 hours, the executive said in a meeting with reporters at BP's Houston campus. The company will pump methanol into the new dome to keep ice from forming. The smaller size of the structure also should keep water out, he said.

Mr. Hayward's comments come after several attempts to halt the estimated 5,000 barrel-a-day leak—ranging from the giant subsea dome to shutting off a giant underwater blowout preventer using robots—have failed. But BP is still trying to fight the spill both on the surface, at the shoreline and at the well site, Mr. Hayward said.

While trying to deploy the smaller dome, BP is drilling a relief well to kill the leaking well, an effort that is expected to take months. A second, backup relief well will be drilled starting at the end of the week, "probably Friday," Mr. Hayward said.

"The relief wells will ultimately be successful," Mr. Hayward said. He added that the company will solve the problem—"it's simply a question of how long it takes," he said.

The spill resulted from the explosion and sinking in April of the Transocean Ltd., Deepwater Horizon drilling rig, which was finishing a well for the London-based oil giant. Eleven crew members were killed by the blast, and the spill threatens the shore of Gulf Coast states. It also risks undermining U.S. appetite for offshore drilling.

Much of the difficulty in containing the leak lies in the rig's depth. Mr. Hayward called the incident "unprecedented in over 20 years of deepwater exploration, and said the lessons learned here "will have profound implications for the industry."

BP is also planning a "junk shot" of diverse materials in an attempt to clog the blow-out preventer and prevent oil and gas from flowing through it. The shot would contain pieces of tire, knots of rope and other items, and will be tried in the next two weeks, said Kent Wells, a senior BP executive.

Mr. Hayward said BP resumed injecting dispersant at the source of the leak on Monday, the use of which "seems to be having a very significant impact" in dispersing the leak, and is being carefully monitored, he said.

http://online.wsj.com/article/SB10001424052748703880304575235821104449994.html?m od=rss_whats_news_us_business

mick silver
10th May 2010, 06:35 PM
why not just blow the well up and hope the sea floor cover the well ........... hope hope if that all they have were f...

Mouse
10th May 2010, 09:53 PM
They are throwing all this poop at the toilet when the solution they want is relief wells so they don't lose their investment. All other attempts will fail by design.

Veni, vidi...evigilavi!
10th May 2010, 11:27 PM
I wonder if dropping a huge anchor on the pipe (pinching it) would do the trick or at least slow the flow of crude until another a better solution arrives? Nah, ok it's not that easy just dreamin' ::)

Johndoe
10th May 2010, 11:48 PM
Has anyone actually seen any photos or videos of this humongous dome which was supposedly set in place? I haven't.


A huge cofferdam would seem to do the job IMHO

Where's all the smart petroleum drilling engineers anyway?