The feasibility study of $ABI is done!
They will be ready to do the second gold mine with only 5 M$ and with the actual gold at 1500$ per Oz, if they JUST use the gap in profit between the 1200$...
Type: Posts; User: RPM222
The feasibility study of $ABI is done!
They will be ready to do the second gold mine with only 5 M$ and with the actual gold at 1500$ per Oz, if they JUST use the gap in profit between the 1200$...